Acceptance of 8 major projects in home decoration acceptance

The construction during the renovation is of course very important, and the acceptance after the completion of construction is also not less. For the problems that arise in the home improvement, we must be able to promptly find out and correct them. Many homeowners lack of professional knowledge related to decoration, and they are “not able to start” for decoration acceptance. Here we talk about home improvement acceptance 8 major projects.

Home decoration acceptance 1, circuit engineering

The leakage switch is correctly installed and used normally; the installation and fixing of electrical devices and equipment should be firm and smooth; the electrical power test, lighting test and lamp control performance are good; the appearance of switches, sockets, terminal boxes and other devices are intact, and the insulation device is crack-free. Solid, level, installation methods in line with the provisions; side-by-side installation of the switch, socket terminal box deviation, concealed switch, socket, terminal box panel, the gap around the box in line with regulations; weak power system function right, to meet the requirements of use, appliance installation Firm and flat.

  

Home decoration acceptance 2, ceiling project

The variety, specification, color of the materials used in the ceiling project shall conform to the requirements of the design specifications; the cover panel and the keel shall be tightly connected, the surface shall be smooth, and shall not be contaminated, fractured, missing corners, hammers, etc. Defects, seams should be uniform, paste the cover panel must not have delamination, plywood shall not be through the place; Shelving cover panel shall not have leakage, penetration, angle phenomenon.

  

Home decoration acceptance 3, floral decoration project

After the floral decoration project is completed and dried, it can be checked; if the floral decoration project is accepted, it should check whether the varieties, specifications and patterns of the floral ornaments meet the design requirements; the floral ornaments should be installed firmly, and their quality requirements and allowable deviations should be in accordance with: the level of the striped floral ornaments and Permissible vertical deviation, the total length of not more than 3 mm; allowable deviation of the position of the individual floral ornaments, shall not be greater than 10 mm; floral ornament surface should be smooth, clear pattern, tight seams, no cracks, warping, lack of edges and other defects; The surface of the flower should be clean and clear with no cracks.

Home decoration acceptance 4, paste project

After the paper is finished and dried, it can be accepted; when it is accepted, check whether the material type, color and pattern meet the design requirements; the wallpaper and wall cloth must be firmly bonded and the surface color is the same, and there must be no bubbles, empty drums, cracks, and creases. And stains, no squinting glue marks; surface smooth, no ripples, wallpaper, wall cloth and hanging mirror line, top corner line, affixed face plate, skirting board, lining board layering, curtain hanging box next to, distance 1.5 meters At the office, there must be no obvious gaps in the visual inspection; the stitching is horizontal and vertical, and the pattern and pattern of the stitching are consistent, not separated from each other, and not overlapped; the yin and yang corners are vertical, the edges and corners are clear, the shadows at the inside of the corner are smooth, and there is no seam at the outside corners. The edges of wallpapers and wall coverings are straight and tidy, and there must be no paper hair or splinters; there must be no leakage, subsidies, and delamination.

Home decoration acceptance 5, plastic board surface layer

Materials, color, and paving should meet the requirements of the households; the surface should be smooth, smooth, wrinkle-free, and free of edging and bubbling; uniform color, tight joints, and straight edges on all sides; degumming should not be more than 20 mm, and the distance between them should not be less than 500 Millimeters; should be tight, firm and flat with the pipe joints; the skirting board should be closely connected with the plastic plate; the skirting board should be straight and the full length height difference should not exceed ±3 mm, which should be close to the wall surface without any gap.

  

Home decoration acceptance 6, wooden floor

Materials should meet the household's requirements and current product standards; flooring installation (bonding) should be solid, no sound, no loosening; wooden floor surface should be polished, no planing, shavings and burrs, varnish flooring The pattern (wood grain) should be clear; the parquet floor seams should be aligned, the gap width is uniform, the surface is clean and there is no glue overflow phenomenon; the skirting board is closely connected with the floor; the skirting board is straight and the full length height difference should be no more than ±3 mm. The wall is tight and seamless.

Home decoration acceptance 7, drainage

The quality of pipelines and fittings should comply with the current standards; the installation of valves should be upright and the switches should be flexible; with water pressure testing, all pipelines, valves, and joints should be free from seepage and water leakage.

  

Home decoration acceptance 8, plate surface

Material and pattern meet the requirements of the households, product quality in line with national standards and technical regulations; paving should be solid, not loose, the level of the ground level is not greater than 0.5 mm; paving pattern is clear, no stain, pulp marks; seam straight, pull through Seam inspection, the deviation is not more than 2 mm; the seam width is not more than 1.0 mm; the height difference between the block and the block is not more than 0.5 mm.

The above is about the introduction of home decoration acceptance , and I hope to help you. If you still want to learn more about home decoration acceptance knowledge, please pay attention to this website decoration information channel.

Construction acceptance

LED Emergency Twin Spot Light

Our LED Emergency Twin Spot Lights are a cost effective replacement for old fashioned halogen emergency twin spot fittings. Due to the low power consumption of the LED lamps, only one battery is required, reducing option during charging. The super bright adjustable heads make this twin spot ideal for commercial and industrial applications. with a self test feature every 90 days to ensure correct operation. The Led Emergency Lights design makes it quick and simple to install.

Twin Spot Emergency Light,Emergency Twin Spot,Led Twin Spot Emergency Lights,Led Emergency Twin Spot Light

Foshan Nai An Lighting Electric Co.,ltd , https://www.articalight.com