To prevent the floor from playing drums, there are three points to note
1. When the earthwork is just completed, don't put solid wood flooring immediately;
2. To join the room environment is wet, it is best to lay a moisture-proof floor;
3. When laying floors, the moisture content of the floor is higher than 6%. The reason for drumming is that solid wood flooring has not undergone a formal drying process, so plastic can be laid under the floor. In addition, the floor should be placed in the room to be paved for two days in advance to allow the wood to adapt to the temperature of the room and prevent the drum from being raised.
1. When the earthwork is just completed, don't put solid wood flooring immediately;
2. To join the room environment is wet, it is best to lay a moisture-proof floor;
3. When laying floors, the moisture content of the floor is higher than 6%. The reason for drumming is that solid wood flooring has not undergone a formal drying process, so plastic can be laid under the floor. In addition, the floor should be placed in the room to be paved for two days in advance to allow the wood to adapt to the temperature of the room and prevent the drum from being raised.
Circular saw
Lishui Aiteli Machine Equipment Co.,Ltd , https://www.aitelimachine.com