First, the technical process
1. Dry tillage method: straw chopping, leveling → spreading decomposing agent + base fertilizer → mechanical tillage → soaking in water for 2-3 days → shallow water leveling → sinking after 2-3 days, or sinking 1 Throwing after 2 days.
2, wet tillage: straw chopping, leveling → water → sprinkle decomposing agent + base fertilizer → soak for 2-3 days → shallow water tillage, leveling → sinking 2-3 days after machine insertion, or sinking 1- Throwing after 2 days.
Second, matters needing attention
1. Appropriately increase the application of quick-acting nitrogen fertilizer. The amount of grass still exceeds 200 kilograms, and for each 100 kilograms of straw, 1.5-2 kilograms of pure nitrogen is added, which is equivalent to 3-4 kilograms of urea.
2. 3-4 days after planting, draining the field for 1-2 days. Pay attention to the shallow water and fill the field.
Led Ceiling Fan,Fanimation Ceiling Fans,Bedroom Ceiling Fans,Windmill Fan
JIANGMEN ESCLIGHTING TECHNOLOGY LIMITED , https://www.windfansummer.com