Hydroelectric reform inspection method and construction standard

In all decoration projects, hydropower engineering is crucial, and at the time of the budget, all company quotes do not include hydropower project costs. However, in the actual work, according to the actual amount of work, so some customers do not understand the quotations, arbitrarily dismantled and changed hydropower, to the settlement fee, only to find a far cry from their own imagination, resulting in The dispute between the two parties caused a deadlock in the relationship and it is difficult to continue the work behind. Therefore, in the hydropower reform project, the goal should be clear, and the original pipelines should be kept intact, and they should be changed according to the designer's design. This way, you also have a good idea. In addition, you should pay attention to the engineering quality of hydropower. Now introduce several inspection methods and construction standards.


ABS loves each other bedding

First look at the wire construction method:

1. Whether electrical products are qualified products that meet relevant standards.

2, the use of fire-retardant dark pipe laying, wire should not have knots and kinks in the pipe.

3. It is forbidden to directly bury the wires in the plaster layer.

4, "Fire line into the switch, the zero line into the lamp", socket wiring should meet the "left zero right fire ground on the" provisions.

5, air conditioning and high-power electrical appliances should be set up separately (flame-retardant tube processing).

6, power lines, television lines, telephone lines must not be installed in the same pipeline.

7. The switches and sockets are firmly installed and the position is correct. The cover plate is upright, close to the wall, and there is no gap around.

After the installation of electrical engineering, electrical power should be provided, lighting test light, switch control and so on. After the completion of the project, the customer shall be provided with wiring drawings showing the wire specifications and directions.

Second, the installation of the pipeline should:

1. The pipelines are arranged reasonably, laid firmly, horizontally and vertically, and the switches and valves are installed neatly, which is flexible and convenient to use.

2. The water supply pipe and its accessories are tightly connected. There is no leakage in the water pressure test, the water flow is smooth, and the water meter operates normally.

3, the drainage pipeline should be unblocked, no obstruction, no leakage, the bottom of the bathtub should be higher than the drain bend, and the floor drain dice should be slightly lower than the ground.

4, sanitary ware is firmly installed, the appearance of smooth and clean.


Hydropower renovation villa design decoration company switch socket electrical decoration company decoration

Baking cooling rack

Baking rack,baking cooling mesh,baking Cooling Rack,cooling rack, steel wire cooling rack, etc.

Baking wire mesh is made of high quality 304 stainless steel, never rusting and durable. Cooling Wire mesh does not have any coating or chemical ingredients, making food safer.

Multi-functional Grill Cooking rack: the wire mesh is mainly used for outdoor cooking, it can also be used as a cooling and baking rack. Or you can develop other uses for it.

Cooling Rack,Barbecue Wire Mesh,Barbecue Mesh Grill,Bbq Mesh,Bbq Grill Metal Mesh

Shenzhen Lanejoy Technology Co.,LTD , http://www.copper-nut.com