This home is my new home, which lasted one and a half months. Almost everything was personally selected or directed by the telephone.
Bucket used to soak the tiles. The pipe seen on the map was just sawed by a plumber, and the upper part was a bit low. When the ceiling was suspended, the bag could not go in. It was only a matter of heightening it. It was a little troublesome. The white wall is waterproof. High enough!
The bathroom began to tiling, the master is very serious.
Another toilet reform, pay attention to see the exposed tube, this is a failure, it should be placed inside the brick, but after coming back from work to see the wall brick has been posted close, so exposed it does not look good, and finally to heavy demolished, built Brick, built the pipe inside. This is also quite troublesome. Both bathrooms are rebuilt and re-posted wall tiles. Therefore, to remind the friends who want to decorate, it is necessary to speak with the master in advance about the specific details and avoid much.
Main Guard Tile
Main Guard Wall Tiles
Kitchen wall tiles
Kitchen starts tiling
Living room tiling
The main floor tiles are also laid
After the bricks in the living room are almost finished, you can step on them.
The toilet and toilet pipes, next to the bricks, are ready to be built into the pipes. This is the first thing I found to be troublesome in the renovation. Not happy for a few days, thought about what board to use for the package, and finally gave it.
When you put the pipes in, you think it looks good.
Another bathroom pipe looks like
Bathroom top
The kitchen floor tile is finished
Laying kitchen tiles
Living room ceiling molding
The background of the restaurant is linked to my living room and dining room. I still want to distinguish between the decoration before starting the renovation. Now that I have finished watching the area, I don't distinguish the difference.
Restaurant background
In front of the door, he also made a model, which was added later. At the time, we wanted to make it simple and as simple as possible, we divided the living room dining room into two groups. The result was added to this type.
The electrician changed the line. My house was renovated for a month. The basic is that the hydropower is warm and at the same time. Carpenters do their jobs, electricians change, and carpentry masters are good. Many places will put forward their own suggestions, are more reasonable, and adopt some more.
The ceiling of the living room balcony is set aside for the location of the motor drying rack. At the time, I was too busy to buy a clothes rack, but I had to measure the size to empty it.
Scratch putty, bright spot
Suspended ceiling
Passenger and passenger ceiling
The door of the kitchen door and the door of the guest and guard were placed on the door. There was no glass, and it was fearful that many people would live and break the glass. So finally settled.
Simple TV background
A small cabinet should be completed
Heating installation
Experienced Living Room Backgrounds Glass Heater Hanger TV Renovation Kitchen Door Decoration Living Room Glass Brick Kitchen Cabinet Door Kitchen Wall Tile Door Door Glass Door Kitchen Glass Sliding Door Bathroom Tile Bathroom Door Bathroom Wall Tile Bathroom Size Bathroom Floor Tile Toilet Ceiling Toilet Waterproof Bathroom Door Size Kitchen Tile Restaurant Ceiling Balcony tiles
1. Material of Stainless steel Test Sieve/Full set of test sieve: Stainless Steel Wire Mesh, galvanized wire mesh, nylon mesh, chrome plate, stainless steel plate, galvanized plate, copper plate, copper
Board, wood, aluminum alloy plate, plastic plate.
2. Features of Stainless steel test sieve/Full set of test sieve : Good filtering, corrosion resistance, easy to clean, acid and alkali resistance, high temperature resistance, uniform aperture size, small orders accepted, long using life, easy to use and treansport, wide application.
3. Package of Stainless steel test sieve/Full set of test sieve : carton /wooden case
shipping by : DHL /TNT/UPS/FEDEX fast shipping or by sea
4.Delivery time of Stainless steel test sieve/Full set of test sieve : 3-10 days after payment done ,according to your requirement.
Test Sieve
Test Sieve,Standard Sieve,Testing Sieve
Anping County Comesh Filter Co., Ltd , http://www.comeshfilter.com