Toilet installation process <br> Inspect the ground water outlet pipe → align the nozzle → lay flat correction → draw a mark → punch holes → putty putty → cover the rubber pad → screw on the nut, → the back of the tank Edge hole painting imprint, → hole punch → insert bolt → fasten → back tank hanging flat alignment → screw nut → install back water tank water elbow → install the eight character door → bend the fork of mother beam → insert the drift door And character door → tighten the nut.
(1) Take out the pipe plug of the ground water outlet, and check that there is no debris in the pipe. Clean the area around the nozzle.
(2) Align the outlet pipe of the toilet with the outlet pipe, place it flat, and draw a mark on the hole of the toilet bolt and remove the toilet.
(3) Insert a hole with a diameter of 20 mm and a depth of 60 mm at the imprint, insert a 10 mm diameter bolt into the hole, secure it with cement, align the eye of the toilet with the bolt, align it with the mark, and after the test, The toilet was removed. Put putty around the outlet of the toilet bowl and the nozzle of the water pipe, and then align the four bolt holes of the toilet with the bolt, lay it flat and align it. Put a rubber pad on the bolt and screw it on until the nut is tight.
(4) When installing the backwater tank water elbow, first remove the nuts of the backwater tank outlet and the toilet water inlet, and put it back to back on the water elbow. The rubber pad is also placed on the sewage pipe. Insert the upper end of the water elbow into the drain of the back tank, insert the lower end into the water inlet of the toilet, push the pad to the nozzle, screw on the nut, straighten the water elbow and straighten it, and tighten it with the pliers. Moderate.
(5) After the installation, conduct a water discharge test and adjust the water level in the water tank.
>>>Links: Summary of mistakes in dressing bathroom
Toilet installation Note points 1) The low water tank toilet uses a galvanized head bolt or a galvanized metal expansion bolt. If the wall is a perforated brick, expansion bolts are strictly prohibited. A soft gasket should be used between the tank and the nut. It is forbidden to use a metal hard plate.
2) The water tank and one-piece toilet shall not exceed 20mm from the wall of the back of the tank.
3) The installation of the toilet shall be not less than 6mm galvanized expansion bolts, and the soft washer shall be fixed between the toilet and the nut. The sewage pipe shall be exposed to the ground 10mm.
Construction acceptance cement bathroom door
Types: Seamless Carbon steel pipe, Welded Carbon steel pipe, ERW Carbon steel pipe, LSAW Carbon steel pipe, SSAW Carbon steel pipe, Ultrasonic Carbon steel pipe, Acoustic Carbon steel pipe, Carbon steel pipe fittings, Hot-dipped galvanized Carbon steel pipe, Rectangular Carbon steel pipe, Square Carbon steel pipe,
Standard and Material: API 5CT,API 5L; ASTM, BS, JIS ,DIN, GB/T 8162, GB/T8163, GB/T3091, GB/T6728, ASTM A53 Gr.B, ASTM A106 Gr.B, ASTM A500 Gr.C, Q195,Q215,Q235B,Q345,20#,45# and so on
Application: used in conveying water, oil, gas and other fluids, For low pressure liquid delivery such as water and gas; for construction and greenhouse structure.
Normal Packing: exporting package or as per clients request.
Carbon Steel Pipe
ASTM A106 Steel Tube,ASTM A53 Steel Tube,Round Steel Tube,Round Mild Steel Tube
Cangzhou Fixed Star Steel Co.,Ltd , http://www.fixedstarpipe.com