The most important content contained in the hidden project is the water supply and drainage project, wire and cable engineering, as well as the floor base and partition base, among which the hydropower project is particularly important. Although this is the decoration company's livelihood, but as your home, related to personal safety, property safety issues, must not be sloppy!
Love plus * Faraday cabinet    Geberit water tank
1. Drainage concealment works
Water pipeline leaks
PP-R pipe installation layout should be reasonable, horizontal and vertical, and pay attention to the pipeline shall not be close to the power supply, and the distance between the shortest distance from the power supply is 0.2 cm, the connection between the pipeline and the sanitary appliance must be close, and no leakage can be found through the water test.
Whether the surface drainage is smooth
Toilets and kitchens are the main places for drainage, so the ground leveling should have a certain slope (2%) to ensure that water collects on the ground into natural water flow and eventually flows to the floor drain. However, it should be noted that the gradient cannot be overemphasized for the sake of smooth water flow, because the slope is over-sloped, which can affect the aesthetics and non-slippage.
Waterproof layer waterproofness is good
Kitchen and back walls are higher than other rooms in terms of waterproof requirements. Waterproof paint should be brushed to 1.8 meters high, and other rooms should be 0.3 meters high.
2. Wire and cable works
Is the PVC pipe connection tight?
Power lines must wear PVC pipes when they are embedded in walls, ceilings, floors, or floors. There should be no kinks in the pipes. The bent position of the wire protection tube should use the matching elbow tool or matching elbow, and there should be no folds.
PVC pipe protection
After the ground circuit is laid, wood shall be placed on both sides of the laid PVC pipe, or slope shall be made with cement mortar to prevent the PVC pipe from being walked over due to walking back and forth during the construction of the worker. The distance between strong and weak electricity should be about 50 centimeters to reduce the electromagnetic interference between them and prevent accidents.
3. Ground floor
Mainly to see whether the ground cement leveling layer is qualified: First, the uneven place of the original room should be paved with cement mortar. In addition, the kitchen and bathroom should have slope, and the slope is very particular.
Finally, we talk about the problem of the grassroots wall. One is whether Baozhu uses red brick walls or cement pull plates. Usually, the construction process requires that the pillars of the kitchen and bathroom rooms must use red brick walls, and reserve the observation port, the size must be consistent with the actual, easy to repair in the future; second is whether to do cement coating processing: increase the contact surface of the tiles, and enhance Friction makes the tile more secure.
Construction Acceptance Nature Flooring Flooring Flooring Cement Room Coatings Decoration Decoration Company Okay Kitchen Integrated Ceiling Kitchen Ceiling Partition Cabinet Red Brick Kitchen Cabinet Door Floor Tile Toilet Waterproof Toilet Ceiling Bathroom Tile Bathroom Size Toilet Leaking Floor Tile Kitchen Tile
The COVID-19 Antigen Saliva Test kit is a lateral flow immunoassay intended for the preliminary screening and qualitative detection of nucleocapsid protein antigen from severe acuterespiratorysyndrome coronavirus SARS-CoV-2which causesthe Coronavirusdisease(COVID-19),in direct saliva sample from individuals suspected of coVD-19 by their healthcare provider within the first seven days of symptom onset.The COVID-19 Antigen Saliva Test kit is for professional use only and is intended to be used as an aid in the diagnosis of SARS CoV-2 infection.
SARS-CoV-2is anenvelopedsingle-stranded RNAvirus ofthe Baenus COVD-19 is an acute respiratory infectious disease. People are generally susceptible.Currently. the patients infected bytheSARS-CoV2are the main source ofinfection:asvmptomatic infected peope car also be an infectious source Based on thecurrentepidemiologica investigation, the incubation period is 1to 14 daysmostly 3to 7 days The main manifestations include feverfatigue and drycough.Nasa congestion, runny nosesore throatmyalgia and diarhea are found in a few cases.
Results are for the identification of SARS-CoV-2 nuceocapsid protein antigen. The SARS-CoV-2 antigen is generally detectable in upper respiratory specimens during the acute phase ofinfectionPositive results indicate the presence of SARS-CoV-2viralantigenshowever cinicai corelation with patient history and other diaanostic information is key to determine status of infection.Positive results don't preclude bacterialinfection or co-infection with other yiruses.eaatveresuts To patients with symptom onset for more than seven days should be treated as presumptive and confirmation with a molecular assayand patient management may be performed according to local regulations as needed.
saliva antigen rapid test kit,antigen test saliva,antigen saliva test kit,rapid antigen saliva
Yong Yue Medical Technology(Kunshan) Co.,Ltd , https://www.yonyuemedical.com